All services / Process Authority & Thermal Processing
Process Authority & Thermal Processing
Need a process authority letter, a thermal process review, or help with a process change? We review the formula, equipment, packaging, and storage conditions to determine what testing and documentation are needed.

How we can help
Review your product and processing conditions
We look at how the product is made and the factors that control its safety, including acidification, heat treatment, water activity, preservatives, packaging, and storage. If you change the formula, container, or process, we can review how that affects the original evaluation.
- Product classification and formulation review
- Process authority letters and scheduled process support, where applicable
- Hot-fill, thermal processing, and other process validation questions
- Review of pH, water activity, hold times, and other product-specific controls
- Process changes, deviations, and supporting study requirements
Before we start
Useful information to have ready
Start with what you have. We will let you know what else is needed.
- Formula with ingredient quantities and specifications
- Process flow, equipment, time and temperature records, and batch size
- Container, closure, fill conditions, intended storage, and shelf life
- Available pH, water activity, microbiology, and validation results
We can arrange how to share detailed formulas and confidential records after the first conversation.
Common questions
Is a process authority letter the same as an FDA filing?
No. A technical evaluation or letter does not itself complete establishment registration or process filing. When those requirements apply, the manufacturer must complete the applicable submissions. We can help prepare the technical information needed for those submissions.
How are acidified foods evaluated?
The regulatory category depends on the full product and process. The federal acidified-food definition generally includes low-acid foods to which acid is added, with water activity above 0.85 and finished equilibrium pH of 4.6 or below, subject to exclusions. A single pH reading does not establish a complete scheduled process.
Can I use a letter for a different formula or package?
Changes should be reviewed before relying on an existing evaluation. The letter or scheduled process applies only to the conditions and limitations it describes.